Water Service Installation Fees

Installation fees (for field work performed by City workforce)

Meter & Service Line Size

Installation fee

5/8" x 3/4"$6,560
3/4" x 3/4"$6,560
3/4" x 1"$6,560
1"x1"$6,560
1" x 1.5"$7,750
1.5" x 1.5" $8,575
1.5" x 2"$8,575
2" x 2"$8,800
Larger than 2"Time & Materials Deposit
Fire Service (any size)Time & Materials Deposit

Meter set on existing service line

Meter & Service Size

Installation Fee

5/8"$530
3/4"$590
1"$650
1.5"$850
2"$941
More than two meters or larger than 2" service lineTime & Materials Deposit

Installation and Facilities fees for new water services

Meter & Service Line Size

Installation Fees

Facilities Fees (Other than Fire Services) 

Total

5/8" x 3/4"$6,560$7,846$14,406
3/4" x 3/4"$6,560$11,773$18,333
3/4" x 1"$6,560$19,614$18,333
1" x 1"$6,560$19,614$26,174
1" x 1.5"$7,750$39,228$27,364
1.5" x 1.5"$8,575$39,228$47,803
1.5" x 2" $8,575$62,763$47,803
2" x 2"$8,800$62,763$71,563
3"Time & Materials Deposit$124,425Time & Materials Deposit plus Facilities Fees
4"Time & Materials Deposit$196,141Time & Materials Deposit plus Facilities Fees
6"Time & Materials Deposit$392,282Time & Materials Deposit plus Facilities Fees
8"Time & Materials Deposit$627,651Time & Materials Deposit plus Facilities Fees
10"Time & Materials Deposit$902,249Time & Materials Deposit plus Facilities Fees

Installation costs for new manifold service

Please see the City of Hayward Standard Detail 219 (SD-219) for allowable manifold service configurations. Standard Details can be found on the Engineering Division page

Meter Size

Service Line Size 

Installation Cost

5/8" x 5/8" meters1"$8,340
3/4" x 3/4" meters1"$8,340
1" x 1" meters1.5"$8,340
1" x 1.5" meters2"$8,875
1.5" x 1.5" meters2"$9,400
1.5" x 2" meters2"$9,600
2" x 2" meters2"$9,800
More than 2 meters ORLarger than 2" Service Line SizeTime & Materials Deposit

Time & Materials Deposits

For work requiring Time & Materials Deposits, the deposit amount will be calculated based on the sizes of proposed water services and estimated costs of labor, equipment, and materials. The Applicant/Developer will be billed based on actual costs of materials, equipment, and labor used to complete the work. If actual costs are less than the deposit amount, the Applicant/Developer will receive a refund in the amount of the unused deposit. If actual costs exceed the deposit amount, the Applicant/ Developer will receive an invoice in the amount of the overage. The Applicant/Developer shall be responsible for all excess charges over the deposit.