SUBMITTAL REQUIREMENTS
REQUIREMENTS FOR UNITS REPLACED IN THE SAME LOCATION
Submit 2 copies each:
- Manufacturer unit specification cut-sheets, to include; weight, size and model number
- Completed T-24 Energy forms. For change-outs use, T-24 Energy form NRCC-MCH 1/2/3/4
Scenario - 2 If existing unit is removed and replaced with a unit weighing 400 pounds or more on the same roof curb, provide:
- All of the items listed above in scenario 1
- 3 copies of structural calculations and/or details stamped and signed by an engineer documenting that the existing roof framing will support the new unit and the curb attachment will sufficiently resist lateral loads. THIS IS REQUIRED DUE TO CODE CHANGES FOR SEISMIC RESISTANCE
- Depending on the scope of work, and the discretion of the plan reviewer, complete submittals might be permitted the same day
- Units >54MBH require an economizer
- Please staple the sets of plans and details together in an organized fashion