Sewer Line Improvements Project
Overview:
The sewer main improvements include replacing approximately 4.1 miles of existing 6, 8, 10, and 12-inch vitrified clay, asbestos cement, and high-density polyethylene pipes at twenty-nine locations throughout the City. Approximately 3.3 miles of sewer main will be replaced by traditional open-cut method constructed in segments to minimize the impact to customers and traffic. The remaining 0.8 mile will either be rehabilitated or replaced by trenchless pipe techniques including microtunneling, pipe bursting, pipe reaming, or cured-in-place pipe (CIPP), where open-cut installation is not recommended due to surface features. This project also includes installation of new manholes in areas where it is often difficult to access the existing manholes located in easements on residential properties. The goal of the project is to improve capacity and maintain operability of the sewer collection system while improving accessibility for future maintenance.
Project Locations:
Sewer line locations were selected by staff based on performance and maintenance data over the past several years. Recommended projects from the 2015 Sewer Master Plan, including upsizing undersized sewer mains, rerouting flows, and installing new sewer lines, were also incorporated to address capacity deficiencies within the existing sewer collection system.
Locations:
- Access Road at Canyon View Park on Farmhill Drive
- Arlette Avenue
- Broadmore Avenue
- C Street
- Carlos Bee Boulevard
- Cathy Way
- Central Boulevard Easement
- Cypress AvenueWhitman Street (Beale Drive - Hyde Drive)
- Eden Landing Road
- Hayward Boulevard
- Hazel Avenue
- Industrial Parkway
- Inglewood Street
- Jackson Street
- Lander Avenue
- Main Street (D Street - A Street)
- Main Street
- Meek Avenue
- Mongomery Avenue
- Norwood Drive
- Oakes Drive
- Osage Avenue
- Peralta Street
- Regal Avenue
- Redbud Lane
- Rockaway Lane
- Rose Street
- Russell Way
- Santa Clara Street
- Silverthorne Place
- Sunset Boulevard
- Sutro Street
- Tennyson Road
- Torrano Avenue
- Tyrrell Avenue
- Whitestone Court Easement
- Wyeth Road
Timeline:
Construction is anticipated to begin in August 2022 and take approximately 16 months.
Fiscal Impact:
The estimated costs for the sewer line improvement project are as follows:
Construction Contract with Contingency | $13,600,00 |
Professional Engineering Services - Consultant | $908,933 |
Inspection | Testing | Permitting | $430,000 |
Construction Administration - City Staff | $375,000 |
Total | $15,313,933 |
Documents:
July 5, 2022 - City Council Meeting
Adopt a Resolution Approving Addendum No. 1 and No. 2 and Awarding a Contract to Ranger Pipelines, Inc., for the Sewer Line Improvements Project, Project No. 07761, in the Amount of $11,087,925 in Addition to Approving $1,108,793 in Administrative Construction Contingency, and Appropriating Additional Funds in an Amount of $3,067,915
May 3, 2022 - City Council Meeting
Adopt a Resolution Approving the Plans and Specifications and Calling for Bids for the Sewer Line Improvements Project, Project No. 07761
Jan. 18, 2022 - City Council Meeting
Adopt a Resolution Authorizing the City Manager to Execute Amendment No. 1 to the Professional Services Agreement with HydroScience Engineers, Inc., Increasing Project Design and Engineering Services for the Sewer and Water Line Improvements Project by $175,000 for a Total Not-to-Exceed Contract Amount of $1,642,865
This project is part of the Strategic Roadmap and falls into the strategic priority of Invest in Infrastructure. Specifically, this item relates to the implementation of the following project (s): Project 15, upgrade sewer collection system replacing 3-4 miles of sewer lines annually.